BIM represents the digital version of a building’s physical and functional characteristics, hence better construction through collaboration and efficiency. BIM in construction makes the decision-making process enhanced through all stages-from design to facility management-through integrating information at each stage. Clash detection identifies conflicts between Structural, mechanical, and electrical systems before construction begins on-site.
So, by necessity, potential collisions must be identified sufficiently early. Identifying issues early allows teams to address them during the design phase. This prevents costly changes later in the site-based environment. The earlier conflicts are resolved, the sooner projects will be completed within time and budget. Overall, it ensures greater success and quality of project delivery.
What is Clash Detection?
In the case of BIM-related clashes, it is identified about possible clashes of different objects ahead of the construction work. The basic types of clashes are:
- Hard conflicts:- Direct interfacing as when ducts and beams cross.
- Soft Conflicts:- Spatial conflicts such as clearance being violated or access obstructed.
- Logical Conflicts:- They are sequencing or workflow problems caused by faulty project logic. These issues typically impact the schedule and construction stage.
BIM is said to ensure smooth going and lower costs in projects by identifying clashes in advance.
BIM clash detection process:-
Step 1: Model Building:-
An accurate 3D model of architecture, structural and MEP disciplines needs to be established to permit proper usage of clash detection. Each model will consider real-life measurements, material specifications, and design details. This approach ensures accurate communication of coordination. Hence, teams will be even able to identify conflicts prior to their experience on the site.
Step 2: Model Integration:-
This brings the need to put together models of more than one discipline into a single overall, coordinated BIM. A coordinated model means that everything works in relation with a team that can view all of its different components hence this is the best way to see everything spatially and functionally aligned. This lays ground before it identifies clashes, making easy collaboration, accuracy, and efficiency towards projects.
Step 3: Clash Detection Software:-
With such popular tools for clash detection as Navisworks, Solibri, and BIM 360, conflict identification potential within integrated models is readily accomplished. These models will scan designs from different disciplines and tag clashes. They do this based on predefined criteria, including geometry and spatial conditions. They depict conflicts, allowing project teams to view, prioritize, and resolve issues during pre-construction stages. This helps avoid rework, reducing costs and delays.
- Navisworks is full of clash detection and offers very advanced collaboration capabilities.
- Solibri provides full rule-based model checking that improves clash detection as well, along with integration of validation against building codes.
- BIM 360 provides cloud-based model management, which supports real-time clash detection and remote team collaboration.
Running Clash Detection:-
Parameters Setting:-
This is where the user sets the parameters that are aimed at narrowing the clash detection search to avoid the false alarms. The key among them includes; clash tolerance to tolerate little overlap, category selection to narrow down to the structural or MEP component to ensure that areas for analysis are correctly set.
Running the Analysis:-
After accepting the parameters, the clash detection software begins scanning the model. It scans for an overlapping geometry or element of a specified tolerance to notice and flag such potential overlaps. It then automatically makes very easily identifiable lists plus a list of identified conflicts to be addressed.
Result Review:-
The clash detection results are analyzed through reviewing clash reports and the visual representations the software gives. The report indicates what clash is being involved, the elements it engages, the type of clash, and the location of clash. Visualization through 3D overlays further helps teams see where the conflict exists hence fostering clear decision-making and consensus from all stakeholders.
Resolving Clashes:-
Team Work:-
Architects, engineers, and contractors will have to work closely during the clash resolution process. They will make decisions intelligently about the adjustments if they discuss the effect of each clash to all parties involved. Thus, all the changes done will be satisfied with the structural, design, and project requirements. Proper communication leads to a smooth workflow with BIM. There will be minimal error and delay, and projects will remain on track and within budget.
Changes and Corrections:-
Conflicts identified are removed by changing the model components in the teams. Duct rerouting or resizing of structure might be changes. The altered components should pass through clash detection again in order to ensure no new conflicts have been introduced. It is a repeated process ensuring coordination in the model is guaranteed; thus, there is a reduced chance of costly rework on site.
Documentation:-
Documentation of conflicts and resolutions is actually crucial for project lifecycles on transparency and continuity. It helps the stakeholders understand change in the design so that future teams are on the same page as the decision taken the previous times. Complete documentation also allows for quality assurance, which makes it impossible for such cases to be repeated in a similar kind of project, and thus support compliance standards.
Benefits of Clash Detection in BIM:-
- Reduction of construction cost: BIM clash detection early help to avoid costly fix site since potential design clashes would have been detected before initiating the construction; therefore this limits the costs associated with rework.
- Efficiency of time: Early solving of clashes in the building project pre-construction process ensures that the workflow for the building project is well achieved and thus does not lag hence it remains within its planned time frame.
- Integration: A coordinated integrated model in BIM is an effective avenue through which architects, engineers, and contractors converge as one source of truth.
- Safety Improved: Early identification and solving the clash results in the actual creation of a safer workspace since conflict that would present problems in terms of structure or installation does not happen at the site.
- Better Resource Utilization: Conflict resolution in advance optimizes resources in the sense that wastage on materials is reduced, and the labor force is fully utilized.
Challenges in Clash Detection:-
- Software limitations:- For most clash detection applications for such complex projects enhance the chances of missing clashes and false positives.
- Solution: Leverage on the best BIM technologies tools with AI-based clash detection solution for the enhancement of accuracy and responsivity.
- Model Complexity:- In general models, more clashes are probable in big models with models having high complexity and long time taken by the whole process of detection.
- Solution: Models can be optimized to smaller fragments and high-performance hardware can process these quickly.
- The Resistance to Change in the Traditional Workflow:- There might be teams that love the traditional approach, and because of this, effectiveness of conflict detection may lose its base, and procedure might not be that effective
- Solution: Train the individuals and highlight how this would be cost-effective as well as time-effective for people to accept.
Clash Detection Emerging Trends:-
AI and machine learning application:- This can lead to analyzing past project records based on AI for prediction towards a new designs clashes occurring that would help in its improvement by being the most accuracy clash detection results.
Use of Virtual or Augmented Reality (VR/AR):- These offer an interface with models under virtual/augmented conditions for virtual experiences of stake holders whereby, on location clash resolution and correction without delays become easy. Through immersion one may easily note clash of an object for quick conflict resolutions. With all collaboration tools improved further
Advanced cloud-based collaboration platforms enable easy remote team communication and ensure that the last version of model updates and clash reports is always available.
Automation in Clash Detection:- Increasing automation in clash detection smoothes workflows by relieving the minds of teams to solve more problems than going through manual checks.
Data Analytics for Decision-Making:- Leverage big data analytics to identify trends and patterns and thereby their applications in proactive clash management to optimize the outcomes of the project.
Read more on:-
For more information about engineering, architecture, and the building & construction sector, go through the posts related to the same topic on the Pinnacle IIT Blogs page.
Find out more accurately what we are going to take off in the course of applying leading new technologies and urban design at Pinnacle IIT.
Subscribe to our YouTube channel and blog websites to obtain all the up-to-date information relating to construction matters.